THE PROCESS OF BOREHOLE DRILLING. STEP 1: HYDROGEOLOGICAL/ GEOPHYSICAL SURVEY: We employ both Digital and Old methods. This gives; ✔Borehole depth, ✓ Expected yield ✔Expected Water Quality TIMELINE: Exercise 1 day, Report 3 Days STEP 2: DRILLING APPROVALS AND PERMITS: The necessary approvals includes; ✓Environmental Impact Assessment (EIA) for NEMA license. ✔Water Resources Authority (WRA) approval. ✔Water Resources Users Association (WRUA) ✓ Letter of No Objection from the local water provider ✓ County Approvals TIMELINE: within one month STEP 3: BOREHOLE DRILLING: The total cost will be calculated based on the recommendations from the Hydrogeological survey results. This includes; ✓Drilling ✓ Gravels ✓Casing ✓Development TIMELINE: 5 Days STEP 4: PUMP TESTING: Aims to determine the optimum rate at which a borehole should be pumped and yield TIMELINE: 24 hours STEP 5: BOREHOLE EQUIPPING AND PUMP INSTALLATION. This involves installation of submersible pump & motor. ✓pipes ✓ submersible cables, ✓ control panel, ✔Inverter and solar panels (if solar powered). TIMELINE: For Electricity 1 Days and 3 days for Solar With availability of resources a borehole can be drilled within 5 to 10 Working days.This includes the drilling,casings, testpumping and water analysis plus pump installation. Call/Whatsapp for any further clarifications.+254769787989 RAVEN LITES ENTERPRISES [email protected]

Comments