Civil Engineering Site Knowledge 👷
                                
                            
                            
                    
                                
                                
                                February 9, 2025 at 09:33 PM
                               
                            
                        
                            👉 *3_4_5 Method* : 
     The 3-4-5 method is a technique used in civil engineering to ensure that a corner of a building or a structure is square. It involves measuring the lengths of three sides of a triangle formed by the corner, with the sides being 3, 4, and 5 units long. If the measurements are correct, the corner is square.