HIDDEN COSTS TO WATCH OUT FOR DURING CONSTRUCTION
Here’s a comprehensive list of “Hidden Costs to Watch Out for During Construction”—these often surprise clients and can derail your budget if unaccounted for:
1. Site Preparation Costs
Clearing, grading, and leveling the land.
Soil testing or geotechnical analysis.
Demolition of existing structures (if any).
2. Foundation Surprises
Rock excavation or removal of tree stumps.
Extra reinforcement due to poor soil.
Water drainage or dewatering in waterlogged areas.
3. Approval & Regulatory Fees
Building permits and government levies.
Environmental impact assessments (if required).
Development control penalties or delays.
4. Utility Connections
Cost of bringing electricity, water, and sewerage to site.
Transformer installation (in new estates or rural areas).
Borehole or water tank systems.
5. Changes in Material Prices
Market fluctuations in cement, iron rods, tiles, etc.
Scarcity of specific imported finishes or fittings.
6. Design Changes (Variations)
Client-requested changes after work has started.
Upgrading materials or layout mid-project.
Custom or luxury finishes not included in original estimate.
7. Labor Overruns
Extended work time due to weather or delays.
Skilled labor costs for specialized installations.
Overtime or weekend work fees.
8. Waste & Material Loss
Breakages, theft, or excess material not accounted for.
Cost of disposal for construction waste.
9. Site Security
Hiring security guards or installing temporary fencing.
Losses from vandalism or theft of equipment/materials.
10. Furniture & Finishing Touches
Wardrobes, cabinets, kitchen fittings.
Light fixtures, curtain rails, water heaters—often excluded in builder’s estimate.
11. Landscaping & External Works
Driveways, walkways, gates, fences, and outdoor lighting.
Greenery or paving not factored into the initial construction cost.
12. Professional Fees
Architect, structural engineer, quantity surveyor, and legal consultants.
Project management or supervision costs.
Pro Tip:
Always keep a 10–15% contingency budget for hidden costs.