
Shah Knowledge Bank
June 8, 2025 at 10:14 AM
🔆 Post: Jammu–Srinagar Rail Link & Chenab Bridge Highlights
📍 Project Overview
✅ 272 km rail line from Udhampur to Baramulla
✅ Divided into 4 sections with 943 bridges and 36 tunnels
✅ Includes the Chenab Bridge & Anji Khad Bridge
📍 Chenab Bridge
✅ Tallest railway bridge in the world: 359m above riverbed
✅ Length: 1.315 km, Arch span: 467m, 17 spans
✅ Cost: ₹1,486 crore, Steel used: 28,660 MT
✅ Built to withstand Zone V earthquakes & wind speeds up to 266 km/h
✅ Design life: 120 years
📍 Anji Khad Bridge
✅ India’s first cable-stayed railway bridge
📍 Operations
✅ Vande Bharat Express to run 6 days/week
✅ Expected full Delhi–Srinagar service by Sept 2025.
#vandebharatexpress #anjikhadbridge #chenabbridge

❤️
2