Mega-Structures

8.8K subscribers

About Mega-Structures

To keep updated on new technologies and Update in construction (Bridges, Highways, Railways & Metros) fields

Similar Channels

Swipe to see more

Posts

Mega-Structures
2/18/2025, 2:24:48 PM

There is no such proposal of NHAI For information to all Many people asked about this after reading the article in the newspaper This news is wrong and Incorrect

Post image
๐Ÿ‘ โค๏ธ ๐Ÿ˜ฎ โŽ ๐Ÿ˜‚ 13
Image
Mega-Structures
2/19/2025, 10:56:10 AM

*Lessons from the Olympic Bridge Helicopter Crash โ€“ A Tragic Reminder of Safety in Engineering* ๐Ÿ‘‡

๐Ÿ˜ฎ ๐Ÿค 2
Video
Mega-Structures
2/20/2025, 4:33:17 PM

In UP budget fund alloted for 4 new expressway along with 2 new bridges in Allahabad (Prayagraj)

๐Ÿ™ ๐Ÿ‘ ๐Ÿชท 9
Video
Mega-Structures
2/19/2025, 1:57:38 PM

๐•๐š๐๐ก๐š๐ฏ๐š๐ง ๐๐จ๐ซ๐ญ-๐ˆ๐ ๐š๐ญ๐ฉ๐ฎ๐ซ๐ข ๐„๐ฑ๐ฉ๐ซ๐ž๐ฌ๐ฌ๐ฐ๐š๐ฒ: ๐€ ๐†๐š๐ฆ๐ž-๐‚๐ก๐š๐ง๐ ๐ž๐ซ ๐Ÿ๐จ๐ซ ๐‚๐จ๐ง๐ง๐ž๐œ๐ญ๐ข๐ฏ๐ข๐ญ๐ฒ ๐š๐ง๐ ๐ˆ๐ง๐๐ฎ๐ฌ๐ญ๐ซ๐ข๐š๐ฅ ๐†๐ซ๐จ๐ฐ๐ญ๐ก To connect Vadhavan Port with the Nagpur-Mumbai Samruddhi Mahamarg, a 118 km long expressway will be constructed between Vadhavan Port and Igatpuri. Once operational, the journey from Vadhavan Port to Igatpuri can be completed in just one hour. The Maharashtra State Road Development Corporation (MSRDC) will undertake the construction of an 85.38 km stretch of this expressway between Charoti and Igatpuri. The project feasibility study and implementation planning are currently progressing. This expressway is estimated to cost โ‚น18,020 crore and will pass through 33 villages in Palghar district and 9 villages in Nashik district. Additionally, studies are ongoing to determine whether the project will be executed on a "Build-Operate-Transfer (BOT)" model or another framework. India's largest port is being developed at Vadhavan in Palghar, making the Vadhavan Port-Igatpuri expressway project a significant undertaking. MSRDC has accelerated the feasibility studies for this project to ensure its timely execution. The Charoti-Igatpuri expressway will traverse the districts of Palghar and Nashik, beginning from Tawa on the Mumbai-Surat National Highway and connecting to the Samruddhi Mahamarg at Igatpuri. It will pass through 33 villages in the talukas of Dahanu, Vikramgad, Jawhar, and Mokhada in Palghar district and 9 villages in Trimbakeshwar and Igatpuri talukas of Nashik district. This highway will directly link Nashik and Palghar districts, facilitating industrial development in the region. MSRDC has already submitted the alignment proposal for the Charoti-Igatpuri expressway to the state government and is awaiting approval.

๐Ÿ‘ ๐Ÿ’ ๐Ÿ˜ฎ ๐Ÿชท 9
Mega-Structures
2/20/2025, 8:55:38 AM
Post image
Image
Mega-Structures
2/20/2025, 8:55:33 AM

๐ƒ๐ข๐ฌ๐ง๐ž๐ฒ๐ฅ๐š๐ง๐-๐’๐ญ๐ฒ๐ฅ๐ž ๐“๐ก๐ž๐ฆ๐ž ๐๐š๐ซ๐ค ๐‚๐จ๐ฆ๐ข๐ง๐  ๐ญ๐จ ๐๐š๐ฏ๐ข ๐Œ๐ฎ๐ฆ๐›๐š๐ข! ๐ŸŽข Children in Mumbai and Navi Mumbai will soon get the chance to meet their favorite cartoon characters like Mickey Mouse, Minnie Mouse, Donald Duck, and Goofy while experiencing thrilling rides. ๐€ ๐ฐ๐จ๐ซ๐ฅ๐-๐œ๐ฅ๐š๐ฌ๐ฌ ๐ญ๐ก๐ž๐ฆ๐ž ๐ฉ๐š๐ซ๐ค, ๐ข๐ง๐ฌ๐ฉ๐ข๐ซ๐ž๐ ๐›๐ฒ ๐ƒ๐ข๐ฌ๐ง๐ž๐ฒ๐ฅ๐š๐ง๐, ๐ข๐ฌ ๐ฌ๐ž๐ญ ๐ญ๐จ ๐›๐ž ๐๐ž๐ฏ๐ž๐ฅ๐จ๐ฉ๐ž๐ ๐จ๐ฏ๐ž๐ซ ๐Ÿ๐ŸŽ๐ŸŽ ๐ก๐ž๐œ๐ญ๐š๐ซ๐ž๐ฌ ๐ข๐ง ๐๐š๐ฏ๐ข ๐Œ๐ฎ๐ฆ๐›๐š๐ข. This ambitious project is part of the MMR Growth Hub initiative, included in its final master plan. The Mumbai Metropolitan Region Development Authority (MMRDA) has taken charge of executing this plan, which aligns with NITI Aayogโ€™s recommendations for economic growth. ๐Œ๐Œ๐‘ ๐†๐ซ๐จ๐ฐ๐ญ๐ก ๐‡๐ฎ๐› & ๐“๐จ๐ฎ๐ซ๐ข๐ฌ๐ฆ ๐ƒ๐ž๐ฏ๐ž๐ฅ๐จ๐ฉ๐ฆ๐ž๐ง๐ญ ๐Ÿ— ๐ˆ๐ง๐Ÿ๐ซ๐š๐ฌ๐ญ๐ซ๐ฎ๐œ๐ญ๐ฎ๐ซ๐ž ๐…๐จ๐œ๐ฎ๐ฌ: The plan aims to transform the MMR region into an international financial and tourism hub, covering sectors like industry, tourism, education, housing, healthcare, and port development. ๐Ÿ ๐€๐ฅ๐ข๐›๐š๐ฎ๐  ๐“๐จ๐ฎ๐ซ๐ข๐ฌ๐ฆ ๐๐จ๐จ๐ฌ๐ญ: Development as a global tourist destination, including the preservation of historical forts in Mumbai and MMR. ๐ŸŽก ๐๐ซ๐จ๐ฉ๐จ๐ฌ๐ž๐ ๐€๐ญ๐ญ๐ซ๐š๐œ๐ญ๐ข๐จ๐ง๐ฌ: A giant Ferris wheel, โ€˜Mumbai Eyeโ€™, and an international theme park in Navi Mumbai to attract both domestic and foreign tourists. ๐“๐ก๐ž๐ฆ๐ž ๐๐š๐ซ๐ค ๐ƒ๐ž๐ญ๐š๐ข๐ฅ๐ฌ ๐ŸŒ๐…๐ข๐ซ๐ฌ๐ญ ๐†๐จ๐ฏ๐ž๐ซ๐ง๐ฆ๐ž๐ง๐ญ-๐‹๐ž๐ ๐“๐ก๐ž๐ฆ๐ž ๐๐š๐ซ๐ค: Unlike existing private resorts, water parks, and amusement centers in MMR, this will be the first government-backed project of this scale. ๐Ÿ“๐‹๐จ๐œ๐š๐ญ๐ข๐จ๐ง: Southern Navi Mumbai ๐ŸŽข ๐Š๐ž๐ฒ ๐€๐ญ๐ญ๐ซ๐š๐œ๐ญ๐ข๐จ๐ง๐ฌ: โœ… ๐‘น๐’†๐’”๐’๐’“๐’• โœ… ๐‘จ๐’๐’Š๐’Ž๐’‚๐’•๐’Š๐’๐’ ๐‘บ๐’•๐’–๐’…๐’Š๐’ โœ… ๐‘น๐’Š๐’…๐’† ๐’๐’๐’๐’†๐’” โœ… ๐‘พ๐’‚๐’•๐’†๐’“ ๐‘ท๐’‚๐’“๐’Œ ๐“๐ก๐ข๐ฌ ๐Ÿ๐ŸŽ๐ŸŽ-๐ก๐ž๐œ๐ญ๐š๐ซ๐ž ๐ญ๐ก๐ž๐ฆ๐ž ๐ฉ๐š๐ซ๐ค ๐ฐ๐ข๐ฅ๐ฅ ๐ž๐ง๐ก๐š๐ง๐œ๐ž ๐ญ๐ก๐ž ๐ซ๐ž๐ ๐ข๐จ๐งโ€™๐ฌ ๐ ๐ฅ๐จ๐›๐š๐ฅ ๐ญ๐จ๐ฎ๐ซ๐ข๐ฌ๐ฆ ๐š๐ฉ๐ฉ๐ž๐š๐ฅ ๐š๐ง๐ ๐จ๐Ÿ๐Ÿ๐ž๐ซ ๐š๐ง ๐ฎ๐ง๐ฉ๐š๐ซ๐š๐ฅ๐ฅ๐ž๐ฅ๐ž๐ ๐ž๐ง๐ญ๐ž๐ซ๐ญ๐š๐ข๐ง๐ฆ๐ž๐ง๐ญ ๐ž๐ฑ๐ฉ๐ž๐ซ๐ข๐ž๐ง๐œ๐ž. ๐ŸŽ ๐Ÿฐ

Mega-Structures
2/21/2025, 8:35:43 AM

World Largest Hybrid (Cable stay + Suspension) bridge Construction method Meaning full worth article to read World Longest Hybrid (Cable stayed + Suspension) bridge - Yavuz Sultan Selim bridge in Tรผrkiye https://www.linkedin.com/pulse/world-longest-hybrid-cable-stayed-suspension-bridge-beomsoo-park-lkhlc?utm_source=share&utm_medium=member_android&utm_campaign=share_via

โค๏ธ ๐Ÿ‘ 5
Mega-Structures
2/21/2025, 4:14:44 AM

A seismic base isolation system from LAIBIN is a Lead Rubber Bearing (LRB) system, which is a type of base isolation technology used in earthquake-resistant buildings. It consists of layers of rubber and steel with a lead core. The rubber provides flexibility, the steel ensures stability, and the lead core absorbs seismic energy through plastic deformation, reducing structural damage. More information: https://www.laibin.com.tr/!l=EN

โค๏ธ ๐Ÿ‘ 4
Video
Mega-Structures
2/20/2025, 10:59:31 AM

*๐‰๐๐๐€ ๐’๐ข๐ ๐ง๐ฌ โ‚น๐Ÿ๐Ÿ,๐ŸŽ๐ŸŽ๐ŸŽ ๐‚๐ซ๐จ๐ซ๐ž ๐Œ๐จ๐” ๐ฐ๐ข๐ญ๐ก ๐๐Œ๐ƒ๐‚ ๐†๐ซ๐จ๐ฎ๐ฉ ๐Ÿ๐จ๐ซ ๐•๐š๐๐ก๐š๐ฏ๐š๐ง ๐๐จ๐ซ๐ญ ๐ƒ๐ž๐ฏ๐ž๐ฅ๐จ๐ฉ๐ฆ๐ž๐ง๐ญ ๐Ÿ๐ŸŽ.๐ŸŽ๐Ÿ.๐Ÿ๐ŸŽ๐Ÿ๐Ÿ“* JNPA Port Authority has signed a Memorandum of Understanding (MoU) with NMDC Group for an investment of โ‚น21,000 crore to deepen the channel and develop infrastructure at Vadhavan Port. The agreement was signed on Tuesday, marking the beginning of work on the proposed โ‚น76,000 crore Vadhavan Port project. Previously, several MoUs were signed in the presence of the Union Minister for Ports, Shipping, and Waterways and the Minister of State to support infrastructure development at Vadhavan Port. Through these agreements, multiple companies have committed to investing thousands of crores in the project, including the โ‚น21,000 crore investment by NMDC Group. During the signing, discussions were also held between JNPA officials and NMDC Group representatives regarding project execution. As per the MoU, the development of offshore land along the Vadhavan coastline will take place. This initiative is a significant step towards transforming Vadhavan Port into a world-class maritime hub.

๐Ÿ‘ ๐Ÿ’ ๐Ÿ™ ๐Ÿชท 6
Mega-Structures
2/19/2025, 10:56:20 AM

Lessons from the Olympic Bridge Helicopter Crash โ€“ A Tragic Reminder of Safety in Engineering. On May 29, 2001, a tragic accident occurred during the installation of a large torch-shaped sculpture on the Olympic Bridge in Seoul korea. A CH-47 Chinook helicopter, operated by the Republic of Korea Army, crashed while attempting to position the sculpture atop the bridgeโ€™s pylon. The incident resulted in the loss of three brave servicemen. The accident happened as the helicopter was lowering itself to detach the cables after placing the sculpture. Unfortunately, the rotor blades struck the structure, causing the aircraft to lose control and crash. While the bridge and surrounding areas suffered damage, no civilian casualties occurred due to prior traffic control measures. This tragedy underscores the critical importance of safety in complex engineering operations. Thorough risk assessments, precise coordination, and adherence to strict safety protocols are essential in preventing such disasters. As engineers, we must continually learn from past incidents to ensure that safety remains the top priority in every project we undertake.

๐Ÿ‘ ๐Ÿ™ 2
Link copied to clipboard!