Mega-Structures
January 18, 2025 at 10:42 AM
Construction of Guwahati RR comprising of A.Chandrapur to Sonapur km. 55.54 B.Jayanagar Underpass Km 163.237 to Jorabat Km 171.000 of NH-27 and C.Improvement of 4-6-Lane stretch of NH-27 from Km 1097.150-184.700 in the state of Assam on DBFOT (Toll)
Authority : NHAI
MODE : BOT
Length: 121.432 KM
Client Cost : 4954.51 cr
DoS: 17.01.2025
DOTO: 18.01.2025
Bidders
1. Adani
2. Dra
3. RVNL
4. Apsara Infrastructure Pvt limited
👍
❤️
😂
🥰
17