Mega-Structures
January 21, 2025 at 02:49 PM
Construction and Upgradation to Four Lane from Manikpur (Design.Ch. Km 0.000) to Sahebganj (Design. Ch. Km 44.650) section of NH139W in the State of Bihar on HAM Mode
Estimated Cost: 1039.55 Cr.
Total Length: 44.650 KM
Client: NHAI
Date of Submission: 02-01-2025
Date of Technical Opening: 03-01-2025
DOFO: 21.01.2025
1. SHIVALAYA-1030.00
2. CEIGALL-990.00
3. GRIL-1097.17
4. JSP-984.00
5. DHARIWAL-1112.13
6. DRA-1224.00
7. SKYLARK INFRA-1212.77
👍
❤️
😢
😭
20