Mega-Structures
January 24, 2025 at 03:01 PM
The *nation’s first cable-stayed bridge* was constructed on a *curve* in Goa, marking a major milestone for the nation’s infrastructure.
NH 17B ROB-2, BAINA ROAD, VASCO GOA
EXTRA DOSED CABLE STAY BRIDGE
The Cable stay portion of the Bridge is 169.82 metres long (46m+77.82m+46m). Two RCC cast-in-situ Pylons are at a spacing of 77.82m, each shall transfer the load of steel structure girders. The deck consist of a carriageway of 21 m. Anti-crash road barriers are provided on the sides of the carriageway.
Contractor: Gammon Enginneers And Contractors Pvt Limited
Design Consultant: TPF Engineering Pvt. Ltd.
Cable Contractor: Scon Infra Prestress LLP
👍
❤️
😮
🙏
👏
22