Testbook Current Affairs
June 11, 2025 at 11:28 AM
_*Indian Railways Cancels Mathura-Vrindavan Conversion Project*_
*Why in News:*
The Indian Railway Ministry has permanently closed the Mathura-Vrindavan railway line conversion project due to being deemed “uneconomical” and facing strong local opposition.
*Key Points:*
* The project aimed to convert the metre gauge to broad gauge at a cost of Rs 402 crore.
* Initiated in 2017-18, the project faced significant local opposition regarding track design and accessibility.
* The metre gauge line was over 100 years old and operated until early 2023.
* Rs 191 crore was already invested in the project before its cancellation.
* Local residents preferred a road on railway land instead of the new railway line.
* The cancellation raises concerns over financial losses and balancing local needs with infrastructure planning.
❤️
👍
🙏
3