NCBA Investment Bank
NCBA Investment Bank
June 13, 2025 at 05:45 AM
*Lake Turkana power output declines on lower wind speed* Company disclosures show that LTWP’s net generation was 1,367 Megawatts-hour (MWh) from 1,481MWh produced in 2023. The drop came in a year when average annual wind speed in the area dropped to 9.6 metres per second (m/s) from 10.6m/s the previous year. Last year’s annual net generation is the second lowest since the 310-Megawatt-Plant started supplying electricity to Kenya Power in 2018. _*Source: Business Daily*_
Image from NCBA Investment Bank: *Lake Turkana power output declines on lower wind speed* Company discl...
1

Comments